Ordered flooring for a duplex, and Home Depot did the measuring. The installer left out the bedrooms, although the entire duplex was to be measured. When the installation was done, we were a 1/3 short on flooring product. The shortage caused a 2 week delay in completing our project. It was the most difficult on our contractor, whose work schedule was impacted most significantly. Worse part is no one takes responsibility for their errors.
Ordered flooring for a duplex, and Home Depot did the measuring. The installer left out the bedrooms, although the entire duplex was to be measured. When the installation was done, we were a 1/3 short on flooring product. The shortage caused a 2 week delay in completing our project. It was the most difficult on our contractor, whose work schedule was impacted most significantly. Worse part is no one takes responsibility for their errors.